MERCURY STORE

Location:

131 8th Street, Brooklyn, NY 11215

Project Stats:

  • Completed: Summer 2020 (expected)

  • Project Area: 17,000 SF

  • # of Floors in scope: 2

  • Type of HVAC: LG VRF Heat Pumps

Scope of Work: This project consisted of the gut renovation and conversion of an existing 1800’s warehouse building into a performative space. Extensive care was taken in the MEP design to acoustically and vibration isolate ductwork and piping passing through/near the studio spaces. The building is one of the few commercial buildings in NYC to utilize CLT (cross laminated timber) in its construction, requiring extensive rigging to install in-place.

Architect: Co Adaptive Architecture

Supporting Consultants:

Renderings c/o Co Adaptive Architecture